Elevation UpScales bull and polar bear emblemELEVATIONUPSCALESElevate the Experience Back to Solar Services

Solar System Builder

Build Your Off-Grid System.

Choose a package, select your components, and watch the system update as you build. Elevation UpScales verifies the final design, compatibility, installation scope, and price.

1
Pick a starting system

Use a package template or begin from scratch.

2
Configure the equipment

Adjust quantities and system options.

3
Review compatibility

See planning alerts before you contact us.

4
Request final design and price

Casey verifies the rig, parts, labor, and install.

Build Your Solar System

Select. Configure. Review.

Use the builder to plan the equipment and capacity you want. The final electrical design and installed quote are confirmed after professional review.

Standard System400W solar · 200Ah battery
Step 1

Choose a starting package

Packages prefill the builder. Every selection can still be adjusted.

Step 2

Solar panels

Select a panel family and quantity. Final roof layout must be measured.

RenogySolar panel component illustration
Renogy 200W N-Type rigid panelCompact rigid panel for common RV roof layouts.
Total proposed array400WRoof-space verification required.
Step 3

Battery bank

Select lithium capacity, cold-weather features, and battery quantity.

RenogyLithium battery component illustration
Renogy 12V 200Ah Core lithium batteryLow-temperature protection and a compact RV-friendly format.
Proposed battery bank200Ah • 2.56kWhNominal storage before design losses and usage limits.
Step 4

Inverter and solar charging

Choose the AC power level and how the array charges the battery bank.

RenogyPower inverter component illustration

RenogySolar charge controller component illustration

Loads you expect to run

Selecting loads helps classify the system. It does not guarantee runtime.

Step 5

Charging, monitoring, and protection

Build the rest of the system around the array and battery bank.

Electrical wiring and protection component illustration
Protection is part of every complete installation.

Required cable sizing, fusing, breakers, disconnects, busbars, terminals, equipment mounting, and labeling cannot be removed from the final design.

Step 6

Add inspection, removal, or custom work

Tell us what needs to happen before or alongside the new system.